1

Energy-Efficient 400 kW Chiller Installation Secures £50,000 Yearly Cost Reduction on Energy and 200 Tonnes CO₂ Reduction

News Discuss 
Project Highlight At a prominent confectionery site in York, Newsome has commissioned a efficient 400 kW chiller, marking the successful conclusion of the project. Designed to advance ESG targets, the installation enhances system dependability while minimising overall power consumption and CO₂ levels. https://infopagex.com/story6125023/high-efficiency-400-kw-chiller-installation-achieves-50k-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story