(D) Loading mail goods onto airplanes is expected to consider significant time a result of the shortage of cargo Area because of the reduction of flights. (D) Arrival of floor mail in the destination place (territory) could be delayed by around a few months in contrast with the normal transport https://omarh789olh4.blogpayz.com/profile